Reno

Renovation Consultation

Layout planning / color strategy / door-stove-bathroom design

Read This First

Decide whether you are planning a renovation or solving an active construction conflict

Best for

People preparing to renovate, already in construction, or trying to resolve layout conflicts before they become expensive.

What you get

Layout priorities, door-stove-bathroom adjustment guidance, color/material direction, and execution checkpoints.

What to prepare

Floor plan, orientation, household context, construction stage, and the conflict you are most worried about.

When to upgrade

If you need to lock the plan before work starts or resolve multiple conflicts, choose a full renovation plan.

Service Overview

Overall Layout Planning

We plan functional zones and flow before construction to reduce avoidable conflicts and rework.

Color Strategy

Color suggestions are aligned with direction, function, and long-term comfort instead of a single rule.

Door-Stove-Bathroom Priorities

These are high-impact variables in residential renovation. We identify and mitigate common conflict patterns early.

Entry Design Guidance

Entry design affects first-flow quality and space stability. We provide practical recommendations on partition, storage, and lighting.

Process

1
Submit Plan + Needs
Send floor plan, orientation, household context, and renovation preferences.
2
Diagnosis
We assess directional structure, flow quality, and high-risk conflict points.
3
Layout Recommendations
You receive practical recommendations on layout, color, materials, and placement priorities.
4
Implementation Guidance
We support execution-stage questions to keep the plan aligned during construction.

Pricing

AI Basic Suggestions

Free

Quick baseline review with major layout cautions.

AI Deep Analysis Package

¥99

Includes 1 deep report + up to 3 follow-up questions within 48 hours. Covers room layout, color/material suggestions, and door-window-stove-bathroom optimization. AI-only package (no 1:1 Consultation).

Full-Process Guidance

¥299

From pre-renovation planning to execution-stage guidance with practical checkpoints.

FAQ

When is the best time to start renovation?

After planning is clear and key conflicts are resolved. For scheduling details, use practical constraints plus timing recommendations.

How should colors be chosen?

Color should balance direction, function, and daily comfort. Avoid one-rule-fits-all choices.

What are common renovation feng shui mistakes?

Common issues include direct door conflicts, stove-water clashes, mirror misplacement, congested flow, and weak ventilation/light planning.

Can I still improve feng shui after renovation is complete?

Yes. Furniture, lighting, zone definition, and usage habits can still produce meaningful improvement without major demolition.

Related Articles

Review methods and tests first, then choose consultation direction with more confidence.

How to Choose Stove Direction
Eliminate key risks early during renovation planning.
Bathroom Facing Bedroom: Practical Fixes
Actionable upgrades that do not require major demolition.
Take Five-Element Test First
Match materials and layout priorities with personal traits.

Quick Decision Reference

Check fit first, then delivery scope and timing, to avoid repeated trial-and-error.

Best For

People preparing renovation, currently in construction, or worried about rework and wanting an executable plan first.

What You Get

Layout optimization, door-stove-bathroom adjustment suggestions, movement and color guidance, plus staged review checklist.

Typical Timeline

Baseline suggestions can be delivered the same day; deep plans are typically delivered within 1 to 3 business days.

How should I start if this is my first renovation feng shui consultation?

Start with a free test to identify the key risk first, then move into a deeper plan instead of making large changes all at once.

If my budget is limited, what should I prioritize?

Prioritize the top 1 to 2 high-impact issues first, then expand step by step.

How often should I review progress after changes?

Review every 7 to 14 days to check comfort, movement flow, and execution quality before your next phase.

Take Free Test First Submit Renovation Consultation

Start Your Consultation Journey

Scan and connect for a case-specific next-step roadmap.

WeChat QR code

Press and hold to scan · Add WeChat